Notes 04 / 04

MOQ, time and the path to delivery

Sampling → Production → QC → Delivery

The numbers on Our Conditions describe how a collection actually moves. They are not a menu.

100 pcs is the minimum at which we open production. It is divided across the models, colors, and sizes in that drop — not one hundred of a single SKU unless that is what you asked for. A five-style collection at 100 pcs is a different cut plan than a single style in one color.

Development takes 2–4 weeks because that is the time to lock design, technical work and materials enough to cut a first sample. Sampling takes another 2–4 weeks because fit and revision are the job, not a formality.

Production is 8–10 weeks after materials are in and the sample is approved. The clock does not start on the first email. It starts when the product is decided and the cloth is in the building.

Payment follows the same logic: 50% when we contract the work, 50% before shipping. We are not asking you to buy a catalog. We are opening a development and a cut.

If your brief is earlier than that — only an idea — we still start. The weeks attach to the stage you are in, not to a generic order.